See Map
Description:
This project would extend Stringtown Road from its
present terminus at Frederick Road (MD 355) to the
east side of I-270/Clarksburg Road interchange,
a distance of 2,735 feet. The road would be constructed
as a four-lane divided roadway with a sidewalk and
a shared-use trail. It would have a 120-foot right-of-way.
The existing Clarksburg Road (MD 121) connection
to the interchange at I-270 would be severed and
the road would end in a cul-de-sac just west of
the Gateway Center Drive intersection. MD 121 would
be accessed from I-270 via Stringtown Road and Gateway
Center Drive.
The
proposed roadway also includes reconstruction of
MD 355 from about 400 feet north of Stringtown Road
to a point roughly 650 feet south of the intersection,
to add a short southbound left-turn and a turn/acceleration
lane along southbound MD 355.
M-NCPPC
Staff Contact:
Larry Cole
(301) 495-4528
Larry.Cole@mncppc-mc.org
Applicant:
Montgomery County Department of Public Works and
Transportation
Staff Contact: Yasamin Esmaili, 240-77-7226
Opportunity
for Public Participation:
Public meetings were held on September 10, 2003
and October 22, 2003 for this project.
Planning
Board Review Process & Case Number:
Mandatory Referral No. 03806-DPW&T-1
Planning
Board Action:
On March 11, 2004, the Planning Board approved the
mandatory referral.
Notes
from M-NCPPC Staff Contact:
Date
of last page update: March 17, 2006
Contact
the Clarksburg Planner |